top of page
2RB0PGW.jpg

Distribution Centre

Germany

Eppingen, Germany

Project value: £300k
Role: Full project management | Initial Survey | Market Research | Tender Process
Production of integrated iBMS specification | Specialist Contractor Selection | Design Review | Commissioning Management | Witness Testing | Seasonal Commissioning. 

IMG_4858.jpeg

BMS Consulting were appointed to provide a full project management service for a technically challenging building systems upgrade at European distribution centre in Eppingen, Germany.


The project involved surveying an existing installation comprising a comprehensive building management system (BMS) and a separate PLC-based lighting and solar shading control system. In addition, the building’s security systems were brought into scope following our initial assessment, ensuring a coordinated approach to all critical building services.


One of the early challenges was the highly integrated nature of the original “early smart building” installation. The system featured bespoke integration between multiple control platforms, with minimal available record documentation — and what documentation did exist was in German.


All reports were delivered in both English and German to ensure effective communication with the client’s German-based technical team and local contractors.


Following contractor appointment, BMS Consulting have been working closely with the selected specialist to develop the detailed design, with our team responsible for reviewing and approving all design documentation to ensure compliance with the client brief and industry best practice.

BMS Consulting

Office address:

Adamson House, The Towers Business Park, Didsbury, Manchester, M20 2YY

 

Telephone:

0330 333 9277

Email:

admin@bms-consulting.co.uk

  • Instagram
  • Facebook
  • Twitter
  • LinkedIn
  • YouTube
  • TikTok

© 2026 BMS Consulting

bottom of page